CRENSHAW_ENGINEERING_

// BUILDS — CRENSHAW_ENG

BUILDS

$ cat /builds/active

// ACTIVE_BUILD

[ ACTIVE ]

PROJECT_F30_320i

PLATFORM: 2013 BMW F30 320i · N20 · RWD

// SYSTEM_STATUS
ENGINE[███████░░░░░░░░░░░░░] 35%IN PROGRESS
SUSPENSION[████████████░░░░░░░░] 60%IN PROGRESS
EXHAUST[█████████░░░░░░░░░░░] 45%IN PROGRESS
INTAKE[████████████████████] 100%COMPLETE
COOLING[███████████████░░░░░] 75%IN PROGRESS
ECU[███████████████░░░░░] 75%IN PROGRESS
BRAKING[█████████████░░░░░░░] 65%IN PROGRESS
TRANSMISSION[██████████░░░░░░░░░░] 50%IN PROGRESS
INTERIOR[█████░░░░░░░░░░░░░░░] 25%IN PROGRESS
EXTERIOR[████░░░░░░░░░░░░░░░░] 20%IN PROGRESS
AUDIO[████████████████████] 100%COMPLETE
// SYSTEM_BREAKDOWN
[01]ENGINEIN PROGRESS

Intake, charge pipes, intercooler, and turbo inlet addressed before tune. Air path is aluminum end-to-end. Stage 2 tune is next.

> VIEW_DETAILS
[02]SUSPENSIONIN PROGRESS

Full geometry overhaul. Corner balance, alignment to track spec, eliminating factory flex.

> VIEW_DETAILS
[03]EXHAUSTIN PROGRESS

Exhaust system upgrade for improved flow and tone. Documented from downpipe back.

> VIEW_DETAILS
[04]INTAKECOMPLETE

Full induction path documented and sealed. Injen SRI, MST intake pipe, FTP chargepipe and boost pipe, VRSF 5" top-mount intercooler. Charge temps managed. System closed.

> VIEW_DETAILS
[05]COOLINGIN PROGRESS

Cooling system refresh to handle increased thermal load from performance driving.

> VIEW_DETAILS
[06]ECUIN PROGRESS

Stage 2 tune in progress. Supporting mods established — intake, intercooler, and charge pipes in place. Calibration comes after suspension is sorted.

> VIEW_DETAILS
[07]BRAKINGIN PROGRESS

Brake system upgrade underway. Focused on consistent pedal feel and fade resistance for track use.

> VIEW_DETAILS
[08]TRANSMISSIONIN PROGRESS

Transmission service and supporting upgrades in progress. Ensuring the drivetrain can handle increased power before tune is finalized.

> VIEW_DETAILS
[09]INTERIORIN PROGRESS

Interior pulled and being rebuilt with purpose. Weight reduction and aesthetic intention.

> VIEW_DETAILS
[10]EXTERIORIN PROGRESS

Exterior work focused on build aesthetic — functional and intentional, not decorative.

> VIEW_DETAILS
[11]AUDIOCOMPLETE

Speaker and audio system upgrade. Daily usability without sacrificing the build direction.

> VIEW_DETAILS

// THIS BUILD IS DOCUMENTED. ALL DECISIONS EXPLAINED.